Home > Geospatial Application Papers > Utility > Power

Power | Telecom | Transport | Others




Hydro power assessment for small ungauged catchments in Himalayan region using GIS techniques


Data to be Used for the Study
To develop the modified regional flow duration model for ungauged catchments and to update the database of Small Hydro Potential Sites in Himachal Pradesh, following data are being collected by this centre for the gauged sites
  • Physiographic characteristics of Catchment Name, Geographic location, Catchment area, Altitude of gauging station, Mean & maximum altitude of catchment, Influence of ice/snow/glaciers, Catchment map/drawing., Stream network in catchment area, portion of catchment which is forest or under glacier, area of catchment covered by snow (mean of maximum snow cover)
  • Meteorological Data Time-series of river flow data (daily or l0-daily), monthly precipitation, temperature, solarity, relative humidity and wind speed for all meteorological station with altitude of station
  • Areal climatology Digital or paper maps of monthly/seasonal/annual precipitation, evaporation, temperature, snow cover, relative humidity, solarity, wind direction etc.
  • Digital Terrain Model data (DTM) Digital Terrain Data for Himachal Pradesh (Longitude 75O-79 O 10' and Latitude 30 O - 34 O) is being procured from SPOT Image Corporation U.S.A. which shall have 305 m elevation posting in a grid data structure. Digital Terrain Models shall be used for computation of slope, channel length, area of catchment, head available for power generation and location of suitable sites for civil structures of small hydro power projects such as Diversion Weir, Feeder and Head Race Channel, Desilting Tank, Forebay Tank, Power House Building etc.

    Repetitive satellite data for these catchments may be effectively used to locate the region of deforestation and impact of small hydro projects development on forest in the catchments. The sites in deforestation regions may be considered as potential sites for hydro power station to control the deforestation to a larger extent.
  • Transmission Line Network Data It is proposed to integrate the existing 11 kV transmission line network with small Hydro Potential Sites. This information will have a bearing on priority of sites selected for development as for those sites which are close to existing transmission line network, expenditure on laying and maintenance of transmission line from small hydro project upto the existing network will be reduced considerably
  • Other Data Geology, Hydro-Geology, Soil Cover and Land Use and other parameters are to be related with modified flow duration curves
The Gee-Graphic locations of gauged sites have been shown in Fig.l. Some of the sites forming a cluster have been shown in fig. 2.


Fig.l.


Fig.2.

Conclusion
Development of small hydro projects in remote places of hilly area will enhance the quality of life in these areas. Development of regional flow duration model and Small Hydro Potential Sites Database will enable to plan for Hydro-Power Development on a sound scientific basis. This will help in bringing the prosperity to the area in particular and region in general. Development of Small Hydro Schemes will also help in reducing the migration from these areas and reduce the dependency on forest and fossil fuel products which are being used to meet the energy needs. The efficient Small Hydro Potential Sites in GIS environment will hasten the process of planning and implementation of small hydro projects for which private sector has shown a considerable interest.

References
  • "Pre-Investment Study of New and Innovative Small Hydero Options", prepared by Alternate Hydro Energy Center for Indian Renewable Energy Development Agency Ltd., Ministry of Non- conventional energy Sources, Govt. of [ndia-1999
  • "Development of Regional Flow Duration Models", developed by Alternate Hydro Energy Center in Collaboration with Department of Earth Sciences, Centre of Remote Sensing, University of Roorkee, under UNDP-GEF Hilly Hydro Project, Ministry of Non-Conventional Energy Sources, Govt. of India-1998
  • Brochure for Entrepreneures, issued by Himurja and HPSEB, Himachal Pradesh-1998
  • India's Electricity Sector - Widening Scope for Private Participation, 4th Edition, issued by-Ministry of Power Govt. of India - Sept. 1998
  • "GIS" in Small Hydro Planning Resource Management", By Arun K. Saraf, Department of Earth Sciences and Arun Kumar, Alternate Hydro Energy Centre, University of Roorkee, journal on GIS Development, Sept.-Oct., 1997

Table-1: Small Hydro Schemes for Private Sector Investment
State Total Identified Alloted Under Allotment
  Projects Capacity (MW) Projects Capacity (MW) Projects Cpacity (MW)
Andhra Pradesh 17 91.5 17 91.15 - -
Tamil Nadu 70 156.95 3 10.90 - -
Karnataka 166 444.40 39 272.90 - -
Orissa 14 195.70 - - - -
Kerala 65 203.08 8 76.50 48 105
50
Uttar Pradesh 11 104.28 3 25.78 8 78.5

0
Madhya Pradesh 93 158.80 13 22.95 80 135
85
Punjab 22 19.40 - - 22 19.40
Himachal Pradesh 137 200.00 54 69.89 83 130.11
Total 595 1,573.70 137 570.07 241 468.86


Table 2: Category of Potential Sites in Himachal Pradesh
Capacity No. of Sites
Identified
Head Range (m)
<30 31-50 51-100 101-300 >300
No. of Sites
0-50            
51-100 5 5        
101-500 43 43        
501-1000 41 41        
1001-3000 77 52 2 9 14  
Above 3000 150     23 111 16
Total 316 141 2 32 125 16

Page 2 of 2