Logo GISdevelopment.net

GISdevelopment > Proceedings > GITA > 2000


GITA 2002 | GITA 2001 | GITA 2000 | GITA 1999 | GITA 1998 | GITA 1997 |  
Sessions

Data development and evolution

Engineering and design applications

Exploiting field and mobile technologies

Invited presentations

It's a brave new world

Leveraging web-based technologies

Mobilizing the enterprise

Operations support

People issues

System architecture

The best of the rest

Uniting the enterprise

User perspectives

Work management solutions



GITA 2000


Operations Support


Storm recovery data acquisition


Results
After two days were spent simulating a Storm Recovery patrol, walking and a driving collection metric are displayed below. Each collection covers the entire distance between two switches.

Collection Type Time (Hr) Distance (M) Distance (Mi) # Of Facilities to be replaced Length of Conductor Down (Ft)
Walking 0.75 1,583.70 0.98 12 560
Driving 0.17 2,780.00 1.73 15 1708

The next table is from the walking collection and is an example of what would be imported into the existing SRR Lotus Notes application. This data would be available for import within 30 minutes of the field computer returning to the office. The software would be configured to import this data automatically once the field unit is connected to the network.

Underground Riser Single Phase
Three Phase
1
1
Services Completely Replaced N/a 1
Poles 45/2 4
Fuse Blown N/a 1
Transformer 25 KVA Single Phase 4

The pilot of the speech-to-data method demonstrated the feasibility speech enabled data collection for Storm Recovery.

Summary
Storm Recovery can be transformed to a much more efficient process as shown by the results verified in the pilot:

Paper Storm Recovery VoCarta Storm Recovery
1. SRR forms are difficult to learn Prompts & teaches the form as you go.
2. SRR forms are difficult to use No writing required. Just see it and say it.
3. Difficult to locate the correct section. GPS highlights the section next to you.
4. Not familiar with area, no signs, lost. Never lost, always see where you are on map.
5. Rain and wind interfere with collection. No wet papers to deal with.
6. The second man in the truck can't keep up. You can call data out 3-5x faster to VoCarta.
7. Dozens of people entering data all night. This step and its inaccuracies are eliminated.
8. No discreet locations of specific damages. Damaged equipment shown on map and tallied.

These efficiencies have the following economic value for FPL:
  • Accurate SRR information in 36 hours instead of 5 days allows SRR to be utilized as a crew forecasting tool which can save FPL $50,000,000 in crew and equipment over-reaction costs.
  • With the GPS locations of specific damages SRR data can be used by GIS to generate best routing for repair crews to expedite truck loading, arrival at feeders and order of repairs along the feeder. Better preparation and routing improves productivity by 15-30% in most cases.
  • A 15% productivity improvement shaves 5 days off 33 days of repair. A 10% damage area hurricane disrupts FPL's $18,000,000 daily cash flow by $1,800,000 per day. Five days represent $9,000,000 in cash flow.
Conclusion
FPL has the opportunity to utilize new technology to change the rules and the paradigm it was previously constrained by. The new capabilities made possible by this technology allow FPL to make leaps forward in its four areas of focus:
  • Cost
    VoCarta reduces daily costs by improving field inspection crew productivity today while improving FPL's asset maps to dramatically reduce future maintenance response times.

    Economical streetlight location and verification reduce collection costs by $450,000 while accelerated collection of unbilled revenue produces an extra $7,500,000 in the next two years

    Storm recovery costs may be reduced by $50,000,000 based on greater speed and more accurate/mapped data from SRR providing better damage estimates earlier with better response routing of repair crews.

    Better deployment and routing of repair crews after a category 4 hurricane could reduce repair time by a week, reducing repair costs while reestablishing cash flow sooner. A one week improvement could save FPL $10,000,000 in repair and $9,000,000 in cash flow.


  • Quality
    Better location and accounting of assets in the field allow FPL to better respond to its own growth needs as well as its emergency outage needs.


  • Customer Orientation
    Better response times and maintenance improve customer satisfaction with FPL's ability to deliver services that satisfy their electricity-related needs.


  • Speed & Flexibility
    With accurate GPS location of vault access, pads, poles, transformers and lights FPL crews can locate and deploy maintenance crews faster. With accurate maps of damaged assets included with SRR information provided days earlier FPL has the flexibility to tailor its response rather than gross overestimation which is the only alternative without good timely field data to ground-truth estimates.
Page 2 of 2
| Previous |

Applications | Technology | Policy | History | News | Tenders | Events | Interviews | Career | Companies | Country Pages | Books | Publications | Education | Glossary | Tutorials | Downloads | Site Map | Subscribe | GIS@development Magazine | Updates | Guest Book