It is not ignorable that there is base datum with not enough precision to support the network computation
and adjustment of a constrained GPS network. With the help of modern geodesy techniques GPS and
adjustment theory and computational techniques, we put forward a new method to carry out the adjustment
of GPS network with not enough precision to support the computation Based on the theory and model, we
have computed a small GPS network in southwest of China to test the theory and model Based upon the
comparison, suggestions and recommends have been applied in this paper
Introduction
According to the case really occurred that most cities horizontal controlling network has been established
with traditional way or advanced GPS techniques originally in China, and in order to conform to the
standard issued by the Chinese Construction Department in 1997,’The Technical Regulations for the
Urban Surveying with GPS’. It is reasonable to adapt the original datum to be the reference frame when we
carry out the surveying engineering and designing surveying network with GPS techniques, and the original
datum and existed large scale maps must be considered. How to make full use of the reasonable parts of the
original reference system in a local city and develop the high accuracy information of data observed with
GPS economically is the problem this paper deals with. And with time going, this problem will be more and
more important in China.
Adjustment Model
The observations of GPS are composed of space vectors that are surveyed with different time intervals.
They can be expressed as (
DX,
DY,
DZ), or differential coordinates of two arbitrary points on the ground. However, we may meet the case that there is base datum with not enough precision to support the network computation and adjustment of a constrained GPS network.
The ways to get the solution of base datum with not enough precision can be approached by following,
- Strict adjustment model for the base datum with not enough precision
Adjustment strictly according to the principle of least square.i.e.adjustment base datum with not enough precision combined to the GPS observations. It is not a convenient and economic method to be use in real work;
- Available approximation adjustment model
Supposing the precision of the base datum is enough in adjustment of GPS network, estimating the contribution of the base datum with not enough precision when evaluation of the computation the final results. It will be shown this is a better and economic way in constrained adjustment of GPS network.
- Strict adjustment model for the base datum with not enough precision
In following discussion we take it as acknowledge that base datum with not enough precision is a kind of observation with a prior-weight, and it is adjusted with general GPS vector observation. According to the principle of least square, we can write the indirect adjustment model as following,
V
1=A
dY + C
dX-l
V
s=
dX
^+L
s ........ (1)
and
l=AY
0+CX
0+l
L
s=0 ....................(2)
In above formula,
dyˆ are the parameter vectors of GPS network,
dXˆ are the base datum parameter vector. And
Formula (1) will be,
V=BZ^+l ................(4)
We can then compose the normal equation based upon (4) as follows,
B
TPBZ^+B
TPl=0 ...............(5)
Suppose,
N=B
TPB,..........W=B
TPl...............
We have,

Then we have,
Z^=-N
-1W ...........................(6)
and,
Q
zz=N
-1
Suppose,